See a completed management system in ten minutes
A tour of a made-up power station whose integrated management system (ISO 9001, 14001, 45001 and 55001) is written, approved and put to work. Watch it when it suits you; ask us anything after.
The words on screen, as text
One home for the whole system
Home shows the whole management system at a glance: what needs attention, the work running, and every document, clause by clause.
Needs attention lists only what someone should act on now. Here: one drawing waiting to be checked.
Work in progress: approving a document set the plugins to work, and each run is recorded.
Clauses 4 to 10: the structure every ISO management system standard shares. One system serves all four standards.
Green means approved and in date. All 53 tools of this site are in use, and each document shows where it stands.
Each clause lists its documents, so an auditor, a manager or a new starter finds anything in two clicks.
Every requirement, every standard
Four standards, one system. Each requirement is one topic, with the clause where each standard asks for it.
The organisation and its context: clause 4.1 in all four standards. Written once, it serves them all.
For each requirement: the documents that meet it, their status, and the standards each serves.
And whether a plugin puts it to work, day to day. A gap shows at once, before an auditor finds it.
Planning, support, operation, evaluation and improvement follow, requirement by requirement.
Documents written for your site
Each document is written by Claude for this site, from the site's profile and the approved documents it builds on.
This one builds on the issues register, the interested parties, the criticality assessment, the SWOT analysis and the scope.
One click drafts a new one, citing its sources, in a few minutes. It runs on the company's own Claude account.
The risk and opportunity register: a summary, the method, the key insights, and the gaps still to close.
Every risk rated on the company's own risk matrix, with its type, likelihood, rating, status and confidence.
Open one for the detail behind it: causes, consequences, existing controls, treatment, residual rating and owner.
Health and safety, environmental, compliance: one register for the whole system, not one per standard.
Every document downloads in Word, in the company's own template and branding, or to Excel, Markdown or SharePoint.
And so for every clause. Objectives and plans: measurable objectives, each with its plan, owner and date.
Environmental aspects and impacts, for ISO 14001, rated the same way as every other register.
Hazards and their controls, for ISO 45001: the same structure, the same approval, in the same system.
The competence matrix: what each role needs to know and be able to do. The training matrix plugin puts it to work.
People decide
Nothing enters the system without a person approving it. This is a draft, revised from the approved version.
Every change is marked against the approved version, so a reviewer sees exactly what is new.
Edit anything in place: here, the likelihood comes down after the inspection.
Say why. The reason is kept with the change, in the document's history.
When it is right, a person approves it: it becomes the version the site works to, and the work it describes follows.
Kept up to date
Documents rely on each other. The document map shows how: an arrow from each document to the ones that use it.
When a new version is approved, every document that relies on it is flagged for review, with what changed.
Every document is reviewed at least once a year, and sooner when something it relies on changes.
Each with when it was approved, last reviewed and next due, and whether a change has flagged it.
Claude can do the review, for a person to confirm or revise. The site stays audit-ready without a document controller chasing it.
Approved documents, put to work
Plugins turn approved documents into the work they describe. Each is installed per site, with only the access you consent to.
Built in, or from the marketplace: audits, controls, maintenance, training, KPIs, obligations, drills, change and more.
Approve the internal audit programme, and the audit manager plans each audit, with checklists from the standards and findings through to closure.
Each audit's checklist comes from the requirements of the standards the site works to, clause by clause.
The controls tracker checks every control in the approved risk register on a cycle, and tracks each treatment to done.
When the register changes, its proposals wait here: a new risk's controls, for a person to accept.
The PM scheduler runs the approved maintenance program: work orders raised as tasks fall due, the overdue flagged.
The training matrix: what each person's role needs, from the approved competence matrix, with expiries and verification on the job.
KPI dashboards measure the approved objectives and indicators: readings against target, and the trend.
The obligations calendar keeps compliance on time: reports, inspections and renewals, raised as they fall due.
Emergency drills from the approved emergency plan, with the actions they raise.
Management of change: each change assessed, approved at the right level, and closed out.
And the shift roster: who works which shift, day by day, with leave and swaps, from the site's own crews.
Asset management, from failure to maintenance
The technical object structure: the plant, system by system, from the asset register.
FMECA: what each class of equipment does, how it fails, and how each failure rates on the company matrix, with its history from the work orders.
Claude proposes the failure modes, a few classes at a time, for engineers to check and accept.
The maintenance program follows from it: a strategy for every failure mode, job plans with steps and resources, and the plans that trigger them.
Reliability block diagrams show what must work for the plant to do its job, and where a single failure stops it.
Drawings, read for you
The drawing register: drawings read from a folder of yours, title blocks extracted, then checked by a person.
Every drawing and document, searchable: number, title, revision, type and status, read from the title block.
Tags found on the drawings are matched to the asset register, so the drawings and the asset data agree.
Each value is shown with how sure the reading is, beside the sheet. Fix any, then mark it checked.
The drawings themselves are never kept: only the register, and small page images.
Your company's look
Your logo and colours throughout the app, and your Word template for every document.